Optimizing Performance of SABC Comminution Circuit of the Wushan Porphyry Copper Mine—A Practical Approach

Clicks: 301
ID: 31587
2016
This research is focused on the Phase I SABC milling circuit of the Wushan porphyry copper mine. Improvements to the existing circuit were targeted without any significant alterations to existing equipment or the SABC circuit. JKSimMet simulations were used to test various operating and design conditions to improve the comminution process. Modifications to the SABC comminution circuit included an increase in the SAG mill ball charge from 8% to 10% v/v; an increase in the mill ball charge from 23% v/v to 27% v/v; an increase in the maximum operating power draw in the ball mill to 5800 kW; the replacement of the HP Series pebble crusher with a TC84 crusher; and the addition of a pebble bin. Following these improvements, an increase in circuit throughput, a reduction in energy consumption, and an increase in profitability were obtained.
Reference Key
zhang2016optimizingminerals Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors Zhang, Wei;
Journal minerals
Year 2016
DOI DOI not found
URL
Keywords Keywords not found

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.